top of page
18839795_1872886496061645_1475519505900381951_o.jpg

PROJECTS GALLERY

Centennial Air Plaza in Englewood 

REMA Upholstery in Commerce City

Two pond pet lodge Arvada Colorado.

2" edge mill and overlay in Cheyenne Wy. Parking lot maintenance.

Phase 1 of parking lot repairs in Thornton Co. 6" Patching for new concrete installed, 4" bottom lift and 2" top lift paving.

Concrete driveways Denver Co. Chaparral Village

Parking lot for Wiggins Elementary

Phase 1 of new parking lot extension and renovation Fortcollins Co.

Mill and patching damaged areas. Parker Co.

New turn lane paving, first lift at 4" to level out for final 2" layer. Thornton Co

Paving commercial parking lot. Southlands Aurora Co

Phase 3 of parking lot repaving at a depth of 4" done in two seprate lifts with petro mat. Fort Collins Co.

New construction expansion, of off ramp for

Bennett Co.

Parking lot maintenance 2" mill and patch of damaged and failed areas around residential complex.

Aurora Co

2-3" mill and patching repair for drive thur area.

Denver Co.

New drive way install at a thickness of 3" compacted, and 2ft wide top soil shoulder along edges.

Phase 1 for Baptist Church

Westminster Co.

Patching at full depth of 6"

Centennial Co.

New drive lane access installed

Johnstown Co.

New parking lot construction

Superior Co.

Paving 2" overlay after mill parking lot.

Highlands Ranch

4" paving in two seprate lifts with HMA of parking lot extension. Centennial Co

2" Edge mill property main entrance, petromat and 2" overlay installed with new parking lines stripping. Denver Co.

Phase 1-2, final 2" top lift using 3/4" virgin hot mix asphalt. Fort Lupton Co.

Phase 1-2, final 2" top lift using 3/4" virgin hot mix asphalt. Fort Lupton Co.

Shopping center parking lot maintenance and repairs.  patch back around repaired concrete.

Centennial Co

Overlay paving at 2" depth after milling access drive lanes for shopping center. Centennial CO

Post Modern in Fort Collins 

Fresenius Kidney Care in  Loveland

​Shell gas station Boulder Colorado.

Handicap parking area Mill 2" and patch with mot mix, restripe all line and signage.

Phase 2 in Thornton Co. Apartments complex, patching around new concrete install, and 2" top lift paving after milling.

Berthoud Co. For Goose Hallow HOA, milling at 2"-3" patching

Removal and replace of existing parking lot.

Greeley Co.

Mill and patching damaged areas. Parker Co.

Mill and patching damaged areas. Parker Co.

Mill and overlay. Aurora Co

Phase 1 new parking lot and lanes install, frist lift of HMA at a depth of 4" in Sterling Co.

2" Mill and patch back for Residential complex lot in Fort Collins Co.

Phase 1 for new private driveway install, preparing subgrade and roadbase before asphalt hot mix paving. Boulder Co.

2" Edge mill and repave existing driveway for Customer in Fortcollins Co.

Patch back of new utility connection at a depth of 8" in three seprate lifts for compaction requirements and edge mill 2" before top lift.  Greely Co.

2" Top lift pavin. New development construction.

Parker Co.

Phase 2 for Baptist Church

Westminster Co.

Driveway repair of damaged areas and expansion at a depth of 3". Conifer Co.

Full depth removal and replace at 3" in depth with new HMA mix. Loveland Co

2" Edge mill and patch back at a full depth of 10" installed

2" mill and pave back with HMA after failed concrete curb and sidewalk repair. Aurora CO

2" mill and patch back, in several damaged areas in residential community in Northglenn Co.

Phase 1- Residential street paving at a depth of 6" in three separate lifts.

City of Johnson

CDOT turn lane paving at 6" in depth installed two separate lifts with tack coat binder, using 1/2" polymer hot mix, Pueblo Co. Us Hwy 50 and 231

Phase 1 & 2- Residential street paving at depth of 6", first two binder layers paved. City of Johnstown

Phase 2 of Senior living complex in final toplift installed.

Sterling Co

Overlay paving at 2" depth after milling drive lanes, handicap parking and damaged areas at residential complex. Denver Co

New Driveway installation, preparing subgrade with class 6 roadbase and compact, paving at a depth of 2.5" woth HMA mix. Dacono Co.

© 2023 K & B Constructions Designed by CMore Design Studio

ab-seal-vertical-black.jpg
  • Black Facebook Icon
bottom of page